Phoenix Modular switch head station 10/100Mbps Manual de usuario Pagina 35

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 266
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 34
Assembly and Installation
6874_en_09 PHOENIX CONTACT 2-9
2.5 Installing the Modular Managed Switch System
2.5.1 Connecting the Supply Voltage to the FL SWITCH MM HS
Head Station
24 V DC The system is operated using a 24 V DC voltage, which is applied at the head station. If
required, the voltage can also be supplied redundantly (see Figure 2-14).
Figure 2-13 Supplying the system using one voltage source
Redundant 24 V DC supply
Figure 2-14 Supplying the system using two voltage sources
If redundant power supply monitoring is active (default setting), an error is indicated if
only one voltage is applied. A bridge between US1 and US2 (dotted line connection)
prevents this error message. It is also possible to deactivate monitoring in web-based
management or via SNMP.
6 8 7 4 0 0 0 5
U S 2U S 1 G N D G N D R 1 R 2
V . 2 4
2 4 V D C
X 5 X 6 X 7
2 4 V D C
6 8 7 4 0 0 0 6
2 4 V D C
U S 2U S 1 G N D G N D R 1 R 2
V . 2 4
X 5 X 6 X 7
Vista de pagina 34
1 2 ... 30 31 32 33 34 35 36 37 38 39 40 ... 265 266

Comentarios a estos manuales

Sin comentarios